YINMIK PH Meter, Digital 4 in 1 PH EC TDS Temp Meter for Water Hydroponics, Waterproof DWC PH and EC PPM Water Tester with Backlit for Nutrients Growing, Indoor Garden, Home Brewing, Pool, Aquarium
Multiparameter pH EC TDS Temp Meters: Grower’s good aid. YK-4 Pen Meter can measure pH, EC (Electrical conductivity), TDS (total dissolved solids), don’t need others, just press {MODE/CAL} key to switch readings of pH, EC (μS/cm / mS/cm), TDS (ppm)
Easy to Calibrate-pH Meter: Automatic pH calibration. Supports 3-point pH CAL at 7.00, 4.00, 10.01. Comes with 2 sets of pH meter calibration powders (4&7&10) for your calibration needs, (EC and tds meters are pre-calibrated). {Easy to Read:} The large screen display with green Backlight helps to read the pH tds ec meter at odd angles and in low light. Press the {HOLD/TEMP} key to lock the reading, which helps to easily record readings
Multiple Uses-pH Tester: Multiparameter Meters can test pH, EC, tds levels and temperature of pH up and down in hydroponics to know your water is in the perfect range for maximum nutrient uptake. Widely used in DWC hydroponics system, RO/DI water, drinking water, tap water, beer, wine, kombucha, milk, home brewing, pool, aquarium, reef tank, hot tub, aquaculture, Spas, fish tank and urine
pH EC Meter with Stable and Reliable Reading: The additional chip makes the pH reading more stable (Reduce the interference of mobile phones and other items on the instrument), and the automatic temperature compensation (32 to 122 ℉) keeps the reading consistent
No Worries of pH PPM Meter: For YK-4 replacement pH Probe; it is available at YINMIK Store, save your maintenance cost; For Calibration, you can find pH 4.00 7.00 10.01 Calibration solution and calibration powder in YINMIK Store; If you need to calibrate EC later, You can come to YINMIK Store to choose EC 1413μS/cm and 12.88mS/cm calibration solution